国产精品尤物福利片在线观看_少妇免费毛片久久久久久久久_久久久久成人精品免费播放动漫_日韩av综合在线观看

歡迎來(lái)到010在線作文網(wǎng)!

中英對(duì)照招標(biāo)的合同協(xié)議書(shū)

實(shí)用文 時(shí)間:2021-08-31 手機(jī)版

關(guān)于中英對(duì)照招標(biāo)的合同協(xié)議書(shū)

篇一:中英文工程合同

  Contract of Construction Project

  合同編號(hào): Contract Number:

  工程名稱(chēng): Project Name:

  發(fā)包方(甲方): 工程設(shè)計(jì)顧問(wèn)(北京) Employer (Party A): International Consulting Engineers ( Beijing) Limited

  承包方(乙方): 中寰藝高建筑裝飾工程有限公司

  Contractor (Party B): Zhong Huanyigao Building Decoration Engineering Co. , Ltd

  根據(jù)《中華人民共和國(guó)合同法》和《建筑安裝工程承包合同條例》及有關(guān)規(guī)定,為明確雙方在施工過(guò)程中的權(quán)利、義務(wù)和經(jīng)濟(jì)責(zé)任,經(jīng)雙方協(xié)商同意簽訂本合同。

  In order to make definite of the rights, obligations and economic responsibilities of both parties during the construction, the parties, in accordance with The PRC Contract Law and Construction Engineering Contract Regulations and relevant provisions, agree to sign this contract.

  第一條 工程項(xiàng)目Article 1, Project item

  1. 工程地點(diǎn): Project site:

  2. 工程范圍: Scope of project

  3. 工程造價(jià):人民幣 元整 (該造價(jià)為包工包料價(jià))

  Project cost: PMBYuan only(Cost of this contract is the contract price for labor and materials)

  第二條施工準(zhǔn)備 Article 2, Preparation for construction

  1.甲方協(xié)助乙方辦理臨時(shí)水電及垂直運(yùn)輸,提供建筑圖紙及有關(guān)隱蔽障礙物的資料。 Party A shall assists party B to deal with the procedures of temporary hydropower and vertical transportation and provide architectural drawings and documents of relevant concealed obstacles .

  2.乙方:. Party B:

 ?、?負(fù)責(zé)施工區(qū)域的臨時(shí)設(shè)施、水電管線的鋪設(shè)、管理、使用和維修工作;

  Be responsible for the works of laying, management, use and maintenance of the temporary facilities, water and electricity pipeline in the construction area.

 ?、?組織施工管理人員和材料、施工機(jī)械進(jìn)場(chǎng);

  Organize construction management staff and construction materials, construction machinery enter the Site.

  ③ 負(fù)責(zé)在裝修期間保持公共地方清潔及每天負(fù)責(zé)將裝物料棄置于由管理處指定的垃圾收集處。

  Be responsible for keeping public places clean during construction and packing

  construction material and leaving in the garbage collection place designated by

  management office each day.

  第三條工程期限 Article 3 Period of Construction

  1. 根據(jù)工期和使用需要,商定工程總施工期為 天(日歷天),自年月 日開(kāi)工至年月 日完工

  According to the period of construction and the use need, the total construction period agreed shall bedays (Calendar days), start from the date of and complete on the date of .

  2.如遇下列情況,經(jīng)甲方現(xiàn)場(chǎng)代表簽證后,工期相應(yīng)順延:

  Construction period shall be prolonged upon Party A site representative's confirmation when the matters occur as follows.

 ?、?按施工準(zhǔn)備規(guī)定,甲方未協(xié)助乙方辦理臨時(shí)水電及垂直運(yùn)輸,影響進(jìn)場(chǎng)施工;

  According to the requirements of construction preparation, Party A fail tot assist Party B to apply for temporary water and electricity and vertical transportation and have an impact on Party B construction;

 ?、?因甲方提出增減項(xiàng)目而造成重大設(shè)計(jì)變更,因而影響進(jìn)度;

  The material modification or change of design due to the party A’ s requirement of addition or deletion of project have the effect of hindrance on the progress of works.

  ③ 未按合同規(guī)定撥付預(yù)付款、工程款而影響施工;

  Party A fail to pay the advance payment and construction cost to party B and impact the construction progress;

 ?、苋肆Σ豢煽咕艿囊蛩囟诱`工期。

  The delay of schedule of construction due to Force Majeure.

  第四條 工程質(zhì)量Article 4 The quality of project

  一.本工程質(zhì)量經(jīng)雙方研究要求達(dá)到雙方約定之驗(yàn)收標(biāo)準(zhǔn)。

  The quality of project should achieve the requirements of acceptance agreed by both parties.

  二.乙方必須嚴(yán)格按照施工圖紙、說(shuō)明文件和國(guó)家頒發(fā)的建筑工程規(guī)范、規(guī)程和標(biāo)準(zhǔn)進(jìn)行施工,并接受甲方的監(jiān)督。

  Party B should carry on the construction in strict accordance with drawing, specification file and regulations and specifications authorized by the competent authorities and be under the supervision of Party A.

  三.乙方在施工過(guò)程中必須遵守下列規(guī)定: Party B should, during the construction, comply with the provisions as follows:

  1.由乙方提供給甲方的所有材料必須經(jīng)甲方同意方可使用,未按要求購(gòu)買(mǎi)嚴(yán)禁使用;All materials provided by Party B should be subject to the approval of Party A prior to use, And none of the same being bought without conformity with Party A requirements can be used.

  2.隱蔽工程必須經(jīng)甲乙雙方檢查,方可進(jìn)行下一道工序;

  The concealed works should be checked by both parties before the next progress;

  3.工程竣工后,乙方按規(guī)定對(duì)工程實(shí)行保修,保修時(shí)間自通過(guò)竣工驗(yàn)收之日算起,保修期一年。

  Party B shall take the liability of maintenance following the complete of works. The period of maintenance shall be one year from the day of acceptance of complete.

  第五條 工程價(jià)款的支付與結(jié)算Article 5 Payment and settlement of the contract price 合同總價(jià)× 50 %, 即元 The total contract price × 50%, which is Yuan.

  中期款The payment of medium-term

  工程進(jìn)度過(guò)半三日內(nèi) Within 3 (three) days after the progress more than half.

  合同總價(jià)× 40 %, 即元 The total contract price × 40%, which is Yuan.

  尾款Final Payment

  竣工驗(yàn)收結(jié)算后七日內(nèi)Within 7 (seven) days after the completion acceptance and settlement.

  合同總價(jià)× 10 %, 即 元The total contract price × 10%, which is Yuan.

  第六條 施工與設(shè)計(jì)變更Article6 The Modification of Construction and Design

  一.乙方交付的設(shè)計(jì)圖紙、說(shuō)明和有關(guān)技術(shù)資料,作為施工的有效依據(jù),開(kāi)工前由甲方組織簽字認(rèn)同,作為施工的補(bǔ)充依據(jù),甲、乙雙方均不得擅自修改。

  Design drawing, illustration and relevant technical data consigned by party B are the basis for construction and shall be confirmed by party A’s signature, which is deemed as the supplementary basis and shall be modified by any party without authorization.

  二.施工中如發(fā)現(xiàn)因甲方要求而發(fā)生的設(shè)計(jì)錯(cuò)誤或嚴(yán)重不合理的地方,乙方應(yīng)及時(shí)以書(shū)面形式通知甲方,由甲方及時(shí)會(huì)同乙方等有關(guān)單位研究確定修改意見(jiàn)或變更設(shè)計(jì)文件,乙方按修改或變更的設(shè)計(jì)文件進(jìn)行施工。若發(fā)生增加費(fèi)用(包括返工損失、停工、窩工、人員和機(jī)構(gòu)設(shè)備調(diào)遷、材料構(gòu)配件積壓的實(shí)際損失)由甲方負(fù)責(zé),并調(diào)整合同造價(jià)。

  If and when any error or material ueasonable problem of design due to party A’s

  requirement, Party B shall notify Party A promptly in writing and decide the amendment or modification of the design documentation by the consultation and negotiation between parties and units concerned. Party B shall carry out construction according to the design documents modified or changed. If project cost increase (including the actual loss of rework loss, stoppage or slowdown, personnel and machine equipment relocated,

  material structures, fixtures backlog), shall be responsibility by Party A, and be adjusted the contract price together with Party B.

  三.乙方在保證工程質(zhì)量和不降低設(shè)計(jì)標(biāo)準(zhǔn)的前提下,提出修改設(shè)計(jì)、修改工藝的合理化建議,經(jīng)甲方、設(shè)計(jì)單位或有關(guān)技術(shù)部門(mén)同意后采取實(shí)施。

  Any reasonable suggestion on the modifications of design and craft proposed by Party B, subject to the quality and without reducing standards of design, could be carried out upon the approval of Party A, design unit or concerned technical department.

  四.甲方如需設(shè)計(jì)變更,必須作出正式修改通知書(shū)和修改圖紙,乙方才予實(shí)施。重大修改和增加造價(jià)時(shí),必須另行協(xié)商,乙方才予實(shí)施。

  Party A should, if any necessary design change, make the formal amendment and modify drawings for Party B’s implementation.. Material changes and cost increased must be negotiated by both parties before Party B implement the same.

  第七條 工程驗(yàn)收Article 7 Acceptance of project

  一.工程施工中地下工程、結(jié)構(gòu)工程必須具有隱蔽驗(yàn)收簽證、試水、抗?jié)B等驗(yàn)收合格記錄。甲方須及時(shí)辦理驗(yàn)收簽訂手續(xù)。

  The underground engineering, structural engineering in the construction of project should be checked and with issue of certificate and the record of acceptance of water test, anti-permeability and so on. Party A should deal with the acceptance signed formalities timely.

  二.工程竣工驗(yàn)收后,甲方才可使用Party A can use the project after completion acceptance

  在規(guī)定的保修期內(nèi),凡因施工造成的質(zhì)量缺陷應(yīng)由乙方無(wú)償保修。其保修條件、范圍和期限按城鄉(xiāng)建設(shè)環(huán)境保護(hù)部(84)城建字第79號(hào)通知印發(fā)的《建筑工程保修辦法(試行)》執(zhí)行。

  In the provision warranty period, any construction quality defects, Party B should make maintenance free of the quality defect due to construction, the scope and duration carry out according to the issuance of Cheng Jian No. 79 notification " Construction engineering guarantee measures (Trial) "by Urban and Rural Construction and Environmental Protection Department (84).

  第八條 違約責(zé)任Article 8 Liability for breach of contract

  乙方的責(zé)任:Responsibility of Party B:

  一.工程質(zhì)量不符合合同規(guī)定的,負(fù)責(zé)無(wú)償修理和返工。

  Take charge of gratis repair and rework if project quality doesn't meet contact's

  stipulation

  二.工程不能按合同規(guī)定的工期交付使用的,按合同中關(guān)于建設(shè)工期提交或拖后的獎(jiǎng)罰規(guī)定償付逾期罰款。

  If fail to deliver the construction according to the contract on time, The overdue fines according to punishment or award of the provision concerning the delivery or delay.

  甲方的責(zé)任:The responsibility of Party A:

  一.未能按照合同的規(guī)定履行自己應(yīng)負(fù)的責(zé)任,除竣工日期得以順延外,還應(yīng)賠償乙方由此造成的實(shí)際損失。

  Failed to fulfill their responsibilities in accordance with the provisions of the contract, in addition to the completion date to be postponed should be compensation for the actual loss of Party B .

  二.工程中途停建、緩建或由于設(shè)計(jì)變更以及設(shè)計(jì)錯(cuò)誤造成的返工,應(yīng)采取措施彌補(bǔ)或減少損失。同時(shí),賠償乙方由此造成的停工、窩工、返工、倒運(yùn)、人員和機(jī)械設(shè)備調(diào)遷、材料和構(gòu)件積壓的實(shí)際損失。

  The ongoing project is stopped, postponed or due to design changes and rework caused by design errors, should take measures to remedy or reduce losses. At the same time, compensate Party B the actual loss of work stoppage, slowdown, re-dispatch rework, reshipment, staff and mechanical equipment relocating, the backlog of materials and components.

  第九條 糾紛解決辦法Article 9 Dispute settlement

  任何一方違反合同規(guī)定,雙方協(xié)商不成,均可向北京仲裁委員會(huì)申請(qǐng)仲裁。

  Either party could, if any party’s breach and fail to negotiation, submit the application of arbitration to the Beijing Arbitration Committee

  第十條 附則Article 10 Supplementary

  一.本合同一式貳份,甲乙雙方各執(zhí)正本一份。

  This contract is execute in two counterparts, each party holds a single original.

  二.本合同自雙方代表簽字,加蓋雙方公章或合同專(zhuān)用章即生效。工程竣工驗(yàn)收符合要求,待保修期滿后合同終止。

  The contract becomes effective after signing and sealing by both parties on this foregoing date. The project final acceptance meet the requirements, after the expiry of warranty, ends the contract.

  甲方(蓋章):Party A (seal): 乙方(蓋章): Party B (seal):

  委托代理人(簽章):Agent 委托代理人(簽章):Agent 電話:Tel: 電話:Tel:

  日期:Date:日期:Date:


本文來(lái)源http://www.nvnqwx.com/shiyongwen/3024005.htm
以上內(nèi)容來(lái)自互聯(lián)網(wǎng),請(qǐng)自行判斷內(nèi)容的正確性。若本站收錄的信息無(wú)意侵犯了貴司版權(quán),請(qǐng)給我們來(lái)信(zaixianzuowenhezi@gmail.com),我們會(huì)及時(shí)處理和回復(fù),謝謝.
国产精品尤物福利片在线观看_少妇免费毛片久久久久久久久_久久久久成人精品免费播放动漫_日韩av综合在线观看
欧美日韩精品免费观看视一区二区| 青青青国产精品一区二区| 精品一区二区成人免费视频| 日本一区二区三区精品视频| 亚洲一区亚洲二区| 欧美激情一区二区三区在线视频观看| 久久中文字幕一区| 精品国产免费人成电影在线观... 精品国产免费一区二区三区 | 九九热精品视频在线播放| 日韩视频欧美视频| www.欧美三级电影.com| 精品国产自在精品国产浪潮| 97免费在线视频| av电影一区二区三区| 99久久久精品免费观看国产| 成人精品久久久| 国产精品稀缺呦系列在线| 国产欧美日韩精品专区| 国产精品一区免费观看| 国产精品一区二区久久国产| 91精品视频播放| 国产成人激情小视频| 视频在线一区二区| 国产精品久久久久久久一区探花| 久久伊人91精品综合网站| 欧美片一区二区三区| 亚洲一区二区三区乱码aⅴ| 久久999免费视频| 亚洲人成人77777线观看 | 欧美一区视频在线| 欧美极品欧美精品欧美图片| 欧美凹凸一区二区三区视频| 国产伦精品一区二区三区精品视频 | 午夜伦理精品一区| 午夜美女久久久久爽久久| 少妇特黄a一区二区三区| 欧美夜福利tv在线| 国产欧美婷婷中文| 91成人福利在线| 久久精品男人天堂| 精品久久久久久综合日本| 亚洲www在线观看| 欧美第一黄网| 97精品伊人久久久大香线蕉| 日韩中文字幕在线免费观看| 久久6免费高清热精品| 日本一区二区视频| 国产一区香蕉久久| 久久久成人精品一区二区三区| 国产精品69久久久久| 久久精品欧美| 精品国产乱码久久久久软件 | 国产精品久久久久久影视| 亚洲午夜高清视频| 欧美在线中文字幕| av在线不卡观看| 国产精品久久网| 日韩在线视频在线| 国产日韩欧美中文在线播放| 久久久99精品视频| 欧美激情亚洲另类| 日本午夜精品一区二区| 国产日韩在线看| 国产成人无码精品久久久性色| 亚洲伊人第一页| 黄色一级二级三级| 久久免费在线观看| 久久久久国产精品一区| 欧美主播一区二区三区美女 久久精品人 | 久久久久久91香蕉国产| 日本在线观看a| 激情视频在线观看一区二区三区| 国产欧美亚洲视频| 久久久精品中文字幕| 日本天堂免费a| 国产精品永久免费在线| 国产精品露脸自拍| 日韩欧美精品在线不卡| 91精品久久久久久久| 最新欧美日韩亚洲| 国产在线不卡精品| 久久久999国产| 日韩免费中文专区| 久久精品综合一区| 亚洲精品免费在线视频| 不卡中文字幕在线| 中文字幕av日韩精品| 国产日韩精品电影| 久久精品视频va| 日本国产在线播放| 久久riav| 日韩人妻精品一区二区三区| 91久久国产综合久久91精品网站| 在线观看一区欧美| 国产精品夜夜夜一区二区三区尤| 久久中文字幕在线| 国产一区二区不卡视频在线观看| 国产精品美女久久久久av福利| 热久久免费国产视频| 日韩在线观看免费网站| 日韩免费一区二区三区| 色偷偷av亚洲男人的天堂| 欧美做暖暖视频| 久久久精品日本| 国内成+人亚洲| 欧美成人精品一区二区| 国产美女搞久久| 亚洲精品日韩av| 国产suv精品一区二区| 欧美亚洲免费在线| 欧美精品情趣视频| 成人h在线播放| 亚洲av综合色区| 久久精品女人的天堂av| 欧美极品欧美精品欧美| 欧美xxxx综合视频| 高清欧美精品xxxxx| 亚洲a区在线视频| 国产av熟女一区二区三区| 欧美尤物一区| 国产精品久久99久久| 国产精品永久免费观看| 日本最新高清不卡中文字幕| 九色综合日本| 黄色一级片网址| 亚洲综合中文字幕在线| 久久久久久久久久久久久国产精品 | 日韩亚洲一区二区| 精品免费一区二区三区蜜桃| 欧美精品在线播放| 99久久激情视频| 日韩精品久久久免费观看| 国产精品免费一区豆花| 91精品久久久久久久久久久久久| 日韩一级片免费视频| 久久精品国产亚洲精品2020| 国产伦精品一区二区三区精品视频 | 99久久免费国| 日本一二三区视频在线| 久久久久久精| 国内精品久久久久伊人av| 亚洲一区二区三区色| 久久精品成人动漫| 国产美女久久久| 欧美一二三不卡| 亚洲美女网站18| 久久深夜福利免费观看| 不卡一卡2卡3卡4卡精品在| 欧美自拍视频在线观看| 亚洲一区二区三区午夜| 国产精品久久久久久久久久ktv| 99精彩视频在线观看免费| 欧美日韩一区在线播放| 亚洲7777| 精品中文字幕在线2019| 国产mv久久久| 成人美女免费网站视频| 欧美乱偷一区二区三区在线| 亚洲三区四区| 国产精品果冻传媒潘| 国产高清不卡av| 北条麻妃在线一区| 精品视频一区二区在线| 欧美专区在线视频| 日本黄网站色大片免费观看| 又粗又黑又大的吊av| 国产精品区一区二区三含羞草| 91av在线网站| 国产美女视频免费| 免费无遮挡无码永久视频| 日本韩国欧美精品大片卡二| 亚洲影院色在线观看免费| 欧美精品制服第一页| 国产精品久久久久久久久久三级| 久久精品久久精品国产大片| 97干在线视频| 91久久久久久久一区二区| 国产美女久久精品香蕉69| 国产日韩一区欧美| 国产中文欧美精品| 蜜臀av性久久久久蜜臀av| 欧美精品欧美精品| 欧美精品123| 狠狠色伊人亚洲综合网站色| 欧美专区中文字幕| 日韩亚洲在线视频| 日本一区精品| 日本精品久久电影| 欧美一级片免费在线| 日本一区二区视频| 日韩美女中文字幕| 欧美日韩天天操| 欧美久久久久久| 激情内射人妻1区2区3区| 明星裸体视频一区二区| 精品一区在线播放| 国产尤物av一区二区三区| 国产女人18毛片| 国产精品一码二码三码在线| av在线播放亚洲|